Lynxby DOMINION
ISO 50001 · Energy management

Meeting ISO 50001,without chasing the data.

Lynx automatically collects, stores and organizes what the standard asks for: baseline, indicators, demonstrated improvement and per-plant reports. Evidencing it stops being a project.

50001:2018 · Energy management

Energy management · Overview The audit data, on a single screen.

Lynx energy management overview: consumption, cost, actual against expected demand curve and deviation against the baseline123
  1. 1
    § 9.1Monitoring and measurementActual consumption against expected, day by day. Without exporting anything.
  2. 2
    § 6.5Energy baselineExpected, actual and savings, in kWh and in euros, with the day of largest deviation flagged.
  3. 3
    § 6.4Performance indicatorkWh per tonne as the EnPI, with its trend against the previous period.

Lynx screenshot, with no data that identifies the plant.

Why now85 TJ≈ 23.6 GWh a year

Above that consumption, the European Union requires an energy management system.

> 10 TJ
periodic energy audit, if there is no management system
One standard, every country
ISO 50001 is the same in any plant: a single system for the whole group

In Spain certified ISO 50001 replaces the mandatory energy audit of Royal Decree 56/2016 if the system includes an energy audit.

Directive (EU) 2023/1791, art. 11. Average threshold over the previous three years; deadlines depend on each Member State’s transposition.

Plan, do, check, act The whole cycle of the standard, on the same platform.

  1. 01PlanWhere every kWh and every euro goes, per meter and per period. The energy review, without a spreadsheet.ISO 50001 § 6.3 · 6.6
  2. 02DoEvery significant energy use, watched. A deviation raises an alert the same day.ISO 50001 § 8.1
  3. 03CheckThe improvement, demonstrated against what was expected. Not against last year.ISO 50001 § 9.1
  4. 04ActThe management review, on a dashboard that updates itself.ISO 50001 § 9.3 · 10.2

Plan is a Lynx screenshot with no data that identifies the plant; the rest are screens with sample data.

Built for the plant Measuring a factory is not measuring a building.

  • Per tonne, not per m²The EnPI, with production from the ERP.
  • From the metering equipment, not the invoicePower analysers, flow meters, gas meters and probes.
  • If metering is missing, we install itDOMINION installs it. Turnkey.
  • In the cloud or at your plantCloud Edition or on-premise.

The evidence Already running in the plant.

17
plants in a steel group, on a single platform
2016
the year that group’s measured history starts
1 year
of history at a foundry: the first one, which is its baseline
Lynx by Dominion

Put a figure on your ISO 50001.

Tick EMS, your plants and your points. The configurator gives you the first year and the renewal.

Or write to us directly at sales@lynxplatform.net

What is still yours. The energy policy, the management team, the internal audit and certification with your body. Lynx does not certify: it gets the data done, which is the part that takes the most time.

← Back to compliance